Quarries industry
ST-EUSTACHE QUARRY
Saint-Eustache, Québec
The challenge
- Separate crushed stone into clean stone.
- Plant feed capacity: Up to 800 MTPH.
- Eight temporary storage hoppers required for off-road truck loading.
- Limited installation space (footprint).
- Installation height constrained by municipal regulations.
- Minimize dust in the building.
Our solution
- Design of a plant according to dimensional parameters established by the client.
- Installation of five screens measuring 8′-0″ width x 27′-0″ length.
- Installation of eight bins with 150 MT capacity for loading off-road type trucks.
- Installation of a set of 25 conveyors for handling stone inside the plant.
- Integration of a dust collector to minimize the effect of dust.
- Design of conveyors to minimize the effect of dust.
- Design of equipment and access points to facilitate maintenance work.
Results
- Adherence to established project schedules.
- Compliance with dimensional constraints for plant installation.
- Quick and efficient equipment startup.
- Achievement of the client’s sorting performance and objectives.