Quarries industry

ST-EUSTACHE QUARRY

Saint-Eustache, Québec

The challenge

  • Separate crushed stone into clean stone.
  • Plant feed capacity: Up to 800 MTPH.
  • Eight temporary storage hoppers required for off-road truck loading.
  • Limited installation space (footprint).
  • Installation height constrained by municipal regulations.
  • Minimize dust in the building.

Our solution

  • Design of a plant according to dimensional parameters established by the client.
  • Installation of five screens measuring 8′-0″ width x 27′-0″ length.
  • Installation of eight bins with 150 MT capacity for loading off-road type trucks.
  • Installation of a set of 25 conveyors for handling stone inside the plant.
  • Integration of a dust collector to minimize the effect of dust.
  • Design of conveyors to minimize the effect of dust.
  • Design of equipment and access points to facilitate maintenance work.

Results

  • Adherence to established project schedules.
  • Compliance with dimensional constraints for plant installation.
  • Quick and efficient equipment startup.
  • Achievement of the client’s sorting performance and objectives.